⚡ MEP Budget Estimator

Rough Order-of-Magnitude (ROM) cost estimate for Electrical, Mechanical, and Plumbing work.
Powered by Elbi MEP Consulting — Fraser Valley, BC

sq ft
Commercial
Industrial
Institutional
Electrical
Power & Lighting
🌡️
Mechanical
HVAC / Ventilation
🔧
Plumbing
Rough-in & Fixtures
Simple
Standard layout, no special systems
Medium
Mixed systems, coordination required
Complex
High-spec, BAS, dense systems
High Ceilings (20 ft+)
Warehouses, manufacturing, large open-span spaces
+15%
Hazardous / Classified Areas
Explosion-proof, Class 1 Div 1 or 2, ATEX zones
+35%
Existing Building (Retrofit / Reno)
Demo, tie-ins, working around existing live systems
+20%
Challenging Site / Remote Location
Limited access, rural, difficult staging or logistics
+15%
Quoted Material / Equipment
Enter a known or quoted dollar amount to add directly to the estimate
$
📊 Budget Estimate (ROM)
TOTAL PROJECT ESTIMATE

⚠️ This is a Rough Order-of-Magnitude (ROM) estimate for early planning only. Actual costs vary based on local labour rates, material pricing, site drawings, project specifications, and applicable codes. Always obtain formal quotes from licensed contractors before budgeting.

Need a more accurate number?
Book a free 30-minute call with Elbi MEP Consulting — we'll review your scope and give you better estimates specific to your project.

📅 Book a Free Consulting Call